TAILORED TO YOU
Whilst there is scope to incorporate specific tenant requirements into any design, any new development will have the following minimum specification:
Specification
-
EPC rating of A
-
6.5 – 8m eaves height
-
37.5kN/m2 minimum warehouse
floor loading -
Electric roller shutter loading doors
-
Fully carpeted and heated offices
-
Entrance lobbies have ceramic tiles, brushed metal ironmongery, vertical radiators and walnut veneer solid doors
-
Eco-initiatives
-
The scheme shall achieve a minimum 10% Carbon reduction through the use of on-site Low & Zero Carbon technologies
-
Photovoltaic panels
-
Tighter construction tolerance to minimise heat loss
-
15% roof lights for increased natural lighting
-
Electric car charging points are provided
-
Air source heating & cooling with heat recovery ventilation
-
Bike shelters
-